California HD EV Charging — Xos Fleet Operations
Fleet Operations · California Network March 2026
Fleet Operations · Charging Infrastructure Reference · March 2026

Heavy-Duty EV Charging Network

6
HD Operators
300+
Active Stalls
1,200 kW
Peak MCS Power
4
Freight Corridors
CCS + MCS
Connector Standards
$0.25 – $0.55
Est. $/kWh Range
Where Xos Trucks Charge in California

Xos trucks are built for California's toughest freight routes — and so is the charging network behind them. Every site listed here is fully compatible with the Xos Class 8 Windrose tractor and Xos medium-duty fleet, supporting CCS, MCS, and CHAdeMO standards. Whether you operate port drayage in Long Beach, run the I-5 corridor or manage a multi-depot regional fleet, there's a charging solution designed around your operation — from pay-per-use travel centers to fully managed CaaS infrastructure.

Network Operators
WattEV
TaaS + Public Network

Broadest CA footprint — 6 active depots from Long Beach to Bakersfield. World's first MCS truck stop at 1,200kW. TaaS per-mile bundle available.

65+
Stalls
1,200kW
MCS Peak
CCS+MCS
Connectors
$0.40+
Walk-up /kWh
I-5 · SR-99 No Sub Required
Forum Mobility
Subscription Depot

Port drayage specialist. FM Harbor at Long Beach handles 200+ trucks/day — guaranteed stall access, no walk-up competition. Fleet subscription only.

44
Stalls
360kW
Max CCS
CCS
Connector
Contract
Pricing
Port LA/LB Sub Required
Greenlane
Open Network · JV

Best flexible option on I-15. Backed by Daimler, NextEra & BlackRock. No membership required — or negotiate fleet offtake for rate stability.

41
Stalls
400kW
Max CCS
MCS-Ready
Precast
Variable
ToD /kWh
I-15 No Sub Required
Terawatt
CaaS Opex Model

Outsource charging infrastructure entirely. Monthly opex fee — no capex. Rialto adds 55 bobtail overnight stalls with 100% solar power on I-10.

73
Stalls
350kW
Max CCS
CCS
Connector
Monthly
CaaS Fee
I-10 Sub Required
EV Realty
Powered Properties®

Grid-first developer. SBD hub: 76 stalls, 9.9MW, pull-through Class 8, opens Q1 2026. Also active in Livermore (I-580) and Vernon (I-10/I-5).

76+
SBD Stalls
MCS+CCS
Connectors
9.9MW
Grid Cap.
Contract
Fleet Only
I-10 · I-215 I-580 Sub Required
Pilot Flying J
Travel Center · EVgo

Only network spanning full I-5 from Oregon to SoCal. 4 CA sites with 24/7 amenities, pull-through stalls and canopies. Walk-up, no subscription.

4
CA Sites
350kW
Max CCS
CCS
Connector
Pay/Use
EVgo App
I-5 Full Length No Sub Required
Pricing estimates only — contact operators directly for fleet rates · © 2026 Xos, Inc.